View Single Post
  #7  
Old 08-28-2002, 05:28 PM
cowfish_29's Avatar
cowfish_29 cowfish_29 is offline
yellow fish forever!
 
Join Date: May 2002
Location: seattle seattle
Posts: 476
Send a message via AIM to cowfish_29
ahh!

well, apparently, 4 pounds of water putty is NOT enough to even cover the track, much less the bumps and banks. I thought that it would cover more because it was concentrated, but nope. when i mix it with water, the overall amount gets smaller.
so, i will be needing 2-3 more cans of this water putty stuff. (I was wrong about the price... its actually about $6 where i buy it). i will need to cover the other half of the track and also create the high and low areas and the bumps.
i am thinking about using something else...some kinda something to build up the bumps a little bit and then cover with water putty (as to conserve it). Anyone got any ideas?
__________________
Extended wheelbase. Trim lever is almost left at default position. I feel, very, scary.
Reply With Quote